Due diligence of 6 existing powerplant in France

1000 kW, Due diligence, France, 2024

Feasibility study for a new high head hydropowerplant in the French Alps

4500 kW, Feasibility study, France (73), 2024

Feasability study of an old mill in Monépiat, Ardèche, France

40 kW, Feasibility study, France (07), 2024

Hydrological Monitoring Campaign in the Alps

0, Due diligence, France (74), 2024-2025

Feasibility study of an old mill on the Somme river

30 kW, Feasibility study, France (80), 2024

Complete project management for the refurbishment of a former sawmill

100 kW, Complete project management, France (01), 2022-2025

Complete project management for the construction of a new hydropower plant on an existing weir

1000 kW, Complete project management, France (74), 2020-2025

Feasibility study for the rehabilitation of four hydroelectric power plants on the Ill River

120 - 350 kW, Feasibility study, France (67), 2024-2025

Feasibility study for the refurbishment of an existing hydropower plant, conserving the historical turbine

55 kW, Feasibility study, France (07), 2025

Due diligence of an existing hydropowerplant

1000 kW, Due diligence, France (05), 2025

Feasibility study of an old mill in the Bourgogne state in France

500 W, Feasibility study, France (71), 2024

Assembly of the administrative licence renewal file for an existing power plant

800 kW, Authorisation application file, France (39), 2024

Hydroelectric feasibility study for the optimization of the Roche power plant

566 kW, Feasibility study, France (39), 2024

Hydroelectric feasibility study for the rehabilitation of a low head and high head former poxer plants

2 x 150 kW, Feasibility study, France (88), 2024

Pre-feasibility study following ADEME’s specifications

53 kW, Summary preliminary study, France (21), 2024-2025

Feasibility study for the refurbishment of a former hydropower station in Switzerland

70 kW, Feasibility study, Suisse, 2024-2025

Assessment of the fish mortality throw an existing hydropower plant

1100 kW, Territorial development scheme, France (46), 2024-2025

Feasibility study for the rehabilitation of an old power plant in north-west of France

20 kW, Feasibility study, France (27), 2023

Feasibility study in center of France for the rehabilitation of an old mill

13 kW, Feasibility study, France (89), 2023-2024

Feasibility study for the restoration of an old mill on the Somme river

14 kW, Feasibility study, France (71), 2023

Drafting a specification document for companies consultation for design/build HPP in Burundi

13 000 kW, Assistance to the Owner, Burundi, 2023

Feasibility study for the installation of a lifting pump

22 kW, Feasibility study, France (74), 2024

Support for the procurement of consultancy services for detailed engineering and supervision of a run-of-the-river dam project (44MW).

44 000 kW, Assistance to the Owner, Indonésie, 2023

Power plant operations supervision, detailed design studies and project management

400 kW, Work Execution Branch, France (39), 2022-2025

Preliminary Project Analysis and dimensioning of a fish pass for a power plant on the Loue River

400 kW, Summary preliminary study, France (39), 2021

Pre-porject study and compilation of administrative documentation for the rehabilitation of an old power plant on the Bienne river

500 kW, Summary preliminary study, France (39), 2022

Feasibility study for increasing the power of an existing power plant in the Doubs region

532 kW, Feasibility study, France (25), 2021

Feasibility study for the rehabilitation of an existing power plant in Ardèche

42 kW, Feasibility study, France (07), 2022

Hydropower potential assessment of the drinking water network of a city in the South East of France

13 - 115 kW, Feasibility study, France (06), 2023

Hydropower potential assessment of the drinking water network of a city in the French Alpes

20 - 40 kW, Feasibility study, France (74), 2022-2023

Feasibility study for the establishment of 3 new drinking water production plants on existing hydropower plants’ reservoir.

10 000 kW, Feasibility study, France (23), 2023-2024

Detailed design studies for the refurbishment of an old mill on the Cher River

22 kW, Detailed design study, France (23), 2023-2024

Feasibiliy and detailed design studies of 4 hydroelectric sites in Cogo Brazza

85 - 2 200 kW, Detailed design study, Congo, 2023

Feasibility study following ADEME guidelines for the rehabilitation of a mill on the Oudrache river.

19 kW, Feasibility study, France (71), 2023

Feasibility study following ADEME guidelines for the rehabilitation of a forge on the Somme river.

19 kW, Feasibility study, France (71), 2023

Technical assessment and calculation of the acquisition cost of a power plant from 1933

320 kW, Due diligence, France (87), 2023

Feasibility study for a new medium-head power plant in South Kivu, Democratic Republic of the Congo (DRC).

12 000 kW, Feasibility study, RDC, 2023

Feasibility study following ADEME guidelines for the rehabilitation of a mill on the Ognon river.

20 kW, Feasibility study, France (21), 2023

Preliminary project and authorization request for the construction of a power plant at the location of a former sawmill

144 kW, Summary preliminary study, France (38), 2021

Feasibility study for the refurbishment of an old mill on the Dree River

37 kW, Feasibility study, France (71), 2022

Detailed design studies for the refurbishment of an old mill on the Mouge River

31 kW, Detailed design study, France (71), 2022-2025

Cost estimate of 3 hydroelectric projects in Africa

400 kW, Territorial development scheme, RDC, 2022

Feasibility study for the rehabilitation of the hydroelectric power plant at Pont de lEtang on the Grosne River in Cluny

226 kW, Feasibility study, France (71), 2023

Identification of the potential for pumping and turbine utilization in Africa on behalf of the EU

87 GW, Territorial development scheme, Afrique, 2022

Compliance of a water intake

100 kW, Feasibility study, France (05), 2021

StreamDiver VS Double-Adjustment Vertical Kaplan

160 kW, Summary preliminary study, France (53), 2021

Technical Audit of the Ray-sur-Saône Hydroelectric Power Plant

130 kW, Due diligence, France (70), 2020

Feasibility study for the rehabilitation of an old mill on the Longviry River

100 kW, Feasibility study, France (39), 2020

Identification of the hydroelectric potential in the drinking water network (11 sites)

0.2-12, Feasibility study, France (06), 2021

Energy recovery study of two waterfalls in a fish plant

19 kW, Authorisation application file, France (26), 2022

Administrative file for the end of the concession period

800 kW, Feasibility study, France (11), 2022

Feasibility study and assistance to the owner in the French department of Haute Savoie (M)

1060 kW, Assistance to the Owner, France (74), 2022-2023

Feasibility study and assistance to the owner in the French department of Haute Savoie (CM)

1160 kW, Assistance to the Owner, France (74), 2022-2023

Hydraulic study for the Moulin Pinte site

8.5 kW, Feasibility study, France (42), 2021

Study of a micro-hydroelectric power plant on a potable water source

2.4 kW, Feasibility study, France (01), 2020

Micro hydroelectric power station on a Karstic source

15 kW, Feasibility study, France (07), 2022

Potential study for the refurbishment of a former hydropower plant

480 kW, Territorial development scheme, France (2A), 2021

Feasibility study for an old water mill in France

70 kW, Feasibility study, France (89), 2022

Due diligence of existing power plants in France

350 kW, Feasibility study, France (39), 2022

Due diligence and feasibility study of an existing power plant in Jura Mountain

500 kW, Feasibility study, France (39), 2022

Feasibility study of an old mill with a subsidence of the sill

140 kW, Feasibility study, France (71), 2022

Refurbishment of a former mill on the Auvezere River.

140 kW, Complete project management, France (24), 2021-2025

Feasibility study and preliminary project analysis for the rehabilitation of an old mill on the Grosne River

90 kW, Due diligence, France (71), 2021

Due diligence  Saint-Génix hydro power plant

500 kW, Feasibility study, France (73), 2021

Due diligence of an existing power plant in the south of France

740 kW, Due diligence, France (11), 2021

Renewable energy resource mapping in Papua New Guinea

-, Territorial development scheme, Papouasie-Nouvelle-Guinée, 2021-2022

Pre-feasibility study for the reclamation of a former sawmill

20 kW, Due diligence, France (74), 2021

Feasibility study for the rehabilitation of an old mill on the Blavet River

45 kW, Feasibility study, France (56), 2021

Reclamation of a former sawmill to produce electricity

15-46 kW, Feasibility study, France (88), 2021

Refurbishment of two former hydroelectric power plants on the Morge

370 kW, Feasibility study, France (38), 2021

Rehabilitation of a former mill on the Morge River in France

43 kW, Feasibility study, France (38), 2021

Due diligence of an existing power plant in France

1090 kW, Detailed design study, France (07), 2021

Feasibility study for an old mill

52 kW, Feasibility study, France (51), 2020

Water treatment plant outflow valorisation study

12 kW, Feasibility study, France (74), 2020-2021

Design and commissioning of two off-grid hydropower plants in Papua New Guinea

400 kW, Due diligence, Papouasie-Nouvelle-Guinée, 2020-2022

Hydroelectric equipment of an existing weir

150 kW, Complete project management, France (19), 2021-2025

3 feasibility studies for new project and an old mill in the North of France

325 kW, Feasibility study, France (80), 2021

Design study of a new medium head hydro scheme in the Vosges

500 kW, Summary preliminary study, France (88), 2020

Pre-feasibility for the rehabilitation of an old mill

15 kW, Summary preliminary study, France (01), 2020

Refurbishment of a 1000 kW low-head hydroelectric scheme

1000 kW, Summary preliminary study, France (25), 2020

Assistance to complete the application files for two new hydro plants

100 kW, Feasibility study, France (25), 2020

Legal recognition of the water rights for six old mills

1000 kW, Authorisation application file, France (25), 2019

Best use of irrigation canal available power

2000 kW, Summary preliminary study, France (05), 2019-2020

Feasibility study for the hydroelectric equipment of an existing weir downtown

500 kW, Feasibility study, France (25), 2019

Detailed design study of a low-head hydropower plant of 1,5 MW

1 500 kW, Feasibility study, France (74), 2019

Feasibility study for the rehabilitation of an old mill

60 kW, Summary preliminary study, France (84), 2020

Feasibility study for two old mills on the Yonne River

300 kW, Feasibility study, France (89), 2020

Detailed design studies of 2 new medium head projects

4500 kW, Feasibility study, France (74), 2019-2020

Rehabilitation of a 50 kW old water mill in western part of France

50 kW, Due diligence, France (56), 2019

Legal recognition of the water rights for three old mills

397 kW, Feasibility study, France (71), 2019

Due diligence of 14 hydroelectric schemes in French West Indies

10 000 kW, Feasibility study, France (97), 2019

Discharge measurement of two mountain stream located in the French Alps

5 000 kW, Detailed design study, France (73), 2019

Installation of underground Francis turbines

2800 kW, Summary preliminary study, Suisse, 2019

Turbining a minimum flow with a second-hand hydraulic turbine

15 kW, Feasibility study, France (39), 2019

Study of the hydroelectric potential of the Somme River in the north of France

30 - 160 kW, Due diligence, France (80), 2018-2019

Due diligence of a 130 kW scheme located on an old irrigation canal

130 kW, Territorial development scheme, France (07), 2018-2019

Expertise of the model and prototype efficiency hills of 2x62 MW Kaplan turbines

124 000 kW, Feasibility study, Ukraine, 2018-2019

Study of the hydroelectric potential of different weir in Bourgogne

2 200 kW, Due diligence, France (89), 2020

Refurbishment of two old hydroelectric schemes on the Orain River

53 kW, Summary preliminary study, France (39), 2019

Design study of 2 new high head hydroelectric schemes in the Alps

1 100 kW, Summary preliminary study, France (74), 2018-2019

Rehabilitation of an old hydroelectric scheme on a mountain stream

180 kW, Feasibility study, France (74), 2018-2019

Analysis of various turbine types for the Arves River near Geneva

960 kW, Summary preliminary study, Suisse, 2018

Preliminary design studies of three high head hydro projects in the French Alps

4240 kW, Due diligence, France (05), 2018-2019

Construction of a new 500 kW hydroelectric power plant in the Pyrenees mountains

500 kW, Feasibility study, France (64), 2017-2018

Study of the hydroelectric potential of Saint-Etienne Métropole

5 - 80 kW, Feasibility study, France (42), 2018

Expertise / due diligence of a 2 MW power plant

2000 kW, Due diligence, France (51), 2018

Refurbishment of an old hydroelectric scheme on the Sèvre Nantaise River

30 kW, Feasibility study, France (44), 2018

Expertise / due diligence of a 2 MW existing power plant

2000 kW, Feasibility study, Sao Tomé-et-Principe, 2018

Feasibility study for the rehabilitation of six hydropower plant

270 kW, Feasibility study, France (29), 2018-2019

Due diligence of a tender proposal for an international project

1 000 kW, Assistance to the owner, Rwanda, 2018

Rehabilitation of two old mills in the Jura Mountains

20 kW, Territorial development scheme, France (39), 2018

Refurbishment of an old hydroelectric scheme

80 kW, Feasibility study, France (25), 2017

EPC contract analysis for the equipment of two low head weirs

400 kW, Due diligence, France (25), 2016 - 2017

Due diligence of 13 small hydroelectric plants

7 200 kW, Feasibility study, France (08, 11, 12, 24, 43), 2017

High head discharge flow valorisation with a crossflow turbine

300 kW, Assistance to the Owner, France (38), 2017

Refurbishment of an old hydro power plant on the Volane River

45 kW, Due diligence, France (07), 2017

Feasibility study for the rehabilitation of an old sawmill

60 kW, Due diligence, France (70), 2018

Project management for the rehabilitation of a hydroelectric power plant

70 kW, Feasibility study, France (27), 2016 - 2018

Rehabilitation of a low head turbine within an industrial site

150 kW, Feasibility study, France (08), 2016 - 2017

Equipment of 4 m high spillway gates with a turbine

400 kW, Feasibility study, France (57), 2016

Equipment of 2 m high spillway gates with 2 turbines

350 kW, Summary preliminary study, France (70), 2016 - 2017

Detailed feasibility and design of an old mill refurbishment with brand new turbines

2 000 kW, Feasibility study, France (25), 2016 - 2017

Installation of a hydrodynamic screw on an existing discharge gate

20 kW, Feasibility study, France (58), 2016

Installation of turbines on several drinking water distribution systems

200 kW, Complete project management, France (35), 2017

Complete project management of the refurbishment and upgrade of an old plant

130 kW, Feasibility study, France (58), 2016 - 2017

Equipment of 2 m high 7 spillway gates with low head turbines

500 kW, Feasibility study, France (71), 2017

Detailed feasibility of a plant rehabilitation of an old plant

300 kW, Complete project management, France (07), 2016 - 2017

Detailed feasibility study for the complete optimization of two EDFs plants

2 300 kW, Feasibility study, France (74), 2015 - 2016

Rehabilitation of three low weirs on the Doubs River

500 kW, Summary preliminary study, France (25), 2015 - 2016

Feasibility study for a low head dam equipment

50 kW, Feasibility study, France (27), 2015

Feasibility study for the refurbishment of an old sawmill

75 kW, Feasibility study, France (01), 2015

Optimization of a power plant under operation

530 kW, Feasibility study, France (87), 2016

Assistance to the owner for a hydropower plant on drinking water system

450 kW, Summary preliminary study, France (64), 2018

Old hydroelectric plant refurbishment and modernization

55 kW, Feasibility study, France (34), 2015

Old water mill upgrade with low head turbines

250 kW, Feasibility study, France (71), 2015

Transient and stability analysis, technical specification of 7 new hydropower plants

53 500 kW, Work Execution Branch, Ouganda & Rwanda, 2016 - 2019

Due diligence of 10 hydroelectric plants under low and medium head

25 000 kW, Due diligence, Italie, 2015

Assistance for 4 VLH turbine supply contract negotiation

2 000 kW, Assistance to the Owner, France (73), 2015

Feasibility study for the rehabilitation of a horizontal Francis turbine

50 kW, Feasibility study, France (23), 2015

Refurbishment of a combined electricity production and drinking water pumping

40 kW, Feasibility study, France (74), 2015 - 2016

Complete project management of vertical Kaplan rehabilitation

2 500 kW, Complete project management, France (22), 2014 - 2016

Detailed feasibility study of a crossflow turbine or Archimedean screws

250 kW, Summary preliminary study, France (73), 2014

Technical assistance to the procurement, manufacturing, and erection of a Kaplan

320 kW, Complete project management, France (39), 2014 - 2015

Complete project management of the refurbishment and upgrade of an old plant (PASEC)

20 000 kW, Complete project management, Comores, 2016 - 2019

Detailed feasibility study for the construction of a new HEPP in Sierra Leone

10 000 kW, Summary preliminary study, Sierra Leone, 2016

Very low head hydroelectric scheme rehabilitation

110 kW, Feasibility study, France (37), 2015

Francis turbine replacement by a Kaplan, with more than doubled nominal flowrate

350 kW, Summary preliminary study, France (73), 2014

Assistance for turbines refurbishment contract negotiation

205 000 kW, Complete project management, Mali, 2014

Due diligences of 4 existing hydroelectric plants

30 000 kW, Due diligence, France (73), 2014

Complete project management of the refurbishment of 4 Kaplan units

1 500 kW, Complete project management, France (25), 2014 - 2016

Feasibility study of a private water mill rehabilitation

100 kW, Feasibility study, France (01), 2014

Detailed feasibility study of a new high head scheme in the Swiss Alps

8 000 kW, Summary preliminary study, Suisse, 2013

Detailed feasibility study of a hydroelectric power plant under operation

2 000 kW, Feasibility study, France (26), 2013

Hydromechanical and electrical equipment due diligence

1 500 kW, Summary preliminary study, France (85), 2013

Pre-feasibility study of various hydro projects (refurbishment or plants for sale)

150 kW, Due diligence, France (07, 26, 38, 73, 74), 2013

Complete project management of SAXO vertical Kaplan construction

200 kW, Complete project management, Suisse, 2014 - 2015

Detailed feasibility study of a Pelton turbine rehabilitation under 600 m head

12 000 kW, Summary preliminary study, France (73), 2013

Complete project management of the hydromechanical part for a rehabilitation

1 500 kW, Complete project management, France (73), 2014 - 2015

Feasibility study of the Montsapey scheme rehabilitation

2 500 kW, Summary preliminary study, France (73), 2012 - 2013

Two new projects of hydroelectric power plants in the upper part of Guinea

44 000 kW, Feasibility study, Guinée Conakry, 2013

Project management for electromechanical part of a high head scheme

3 800 kW, Complete project management, France (73), 2012 - 2014

Valorization of exhaust water flowrate from a Molybdenum plant

250 kW, Feasibility study, Chili, 2012

Old hydroelectric plant refurbishment and power increase

3 500 kW, Feasibility study, Suisse, 2012 - 2013

Water treatment plant outflow valorization study (74)

30 kW, Feasibility study, France (74), 2013

Refurbishment of two hydroelectric plant on the Doubs River

2 000 kW, Feasibility study, France (25), 2013

Project of hydroelectric power plant in Uganda

7 000 kW, Summary preliminary study, Ouganda, 2013

Renewal of the EDF/SHEM French hydroelectric concessions (Drac)

218 000 kW, Due diligence, France (38), 2012 - 2014

Renewal of the EDF/SHEM French hydroelectric concessions (Têt)

37 000 kW, Due diligence, France (66), 2012 - 2014

Tender documents of the High Grand Falls hydroelectric powerplant

500 000 kW, Due diligence, Kenya, 2012

Renewal of the EDF/SHEM French hydroelectric concessions (Ossau et Louron)

359 000 kW, Feasibility study, France (64), 2012 - 2014

Storage hydropower plants refurbishment and upgrade

2 050 kW, Due diligence, France (85), 2012

Refurbishment study of an old water mill on the Loir River

250 kW, Feasibility study, France (41), 2011

Project management for electromechanical part of a high head scheme in Maurienne

3 500 kW, Complete project management, France (73), 2011 - 2012

Feasibility study of a hydroelectric scheme located on a mountain stream

250 kW, Feasibility study, France (73), 2011

Optimization study of the hydroelectric plant of Rophemel dam

5 000 kW, Summary preliminary study, France (22), 2011 - 2012

Detailed studies and assistance to the demand for the water right renewal

50 kW, Authorisation application file, France (03), 2012 - 2014

Feasibility study of building a wind farm in Philippines

250 kW, Feasibility study, Philippines, 2009

Maragondon River feasibility studies of hydroelectric plants

1 000 kW, Feasibility study, Philippines, 2009

Feasibility study of a pico-hydroelectric plant

10 kW, Feasibility study, France (87), 2010

Feasibility study of an old water mill in a very old building

50 kW, Feasibility study, France (35), 2010

Existing medium head dam flow turbines study

1 000 kW, Feasibility study, France (2A et 2B), 2010

Pre-feasibility study of the major project of Sounda on the Kouilou River

800 000 kW, Due diligence, Congo, 2010

Overhaul feasibility study of four old mills and hydroelectric schemes

100 kW, Feasibility study, France (03), 2010

Water mill upgrade detailed feasibility study following a detailed tender

100 kW, Feasibility study, France (61), 2010 - 2011

Refurbishment of an old retired hydroelectric plant

70 kW, Feasibility study, France (25), 2007

24 Boulevard Carnot | F-74200 |Thonon-les-Bains
Tél : +33 4 50 70 79 83 | E-mail : info[at]hydreole.com
MENTIONS LEGALES

  • Our consulting firm
  • Our Projects
  • Our Tools
  • English
  • Français