All Less than 1 MW More than 1 MW Studies Project management France International Due diligence of 6 existing powerplant in France 1000 kW, Due diligence, France, 2024 Feasibility study for a new high head hydropowerplant in the French Alps 4500 kW, Feasibility study, France (73), 2024 Feasability study of an old mill in Monépiat, Ardèche, France 40 kW, Feasibility study, France (07), 2024 Hydrological Monitoring Campaign in the Alps 0, Due diligence, France (74), 2024-2025 Feasibility study of an old mill on the Somme river 30 kW, Feasibility study, France (80), 2024 Complete project management for the refurbishment of a former sawmill 100 kW, Complete project management, France (01), 2022-2025 Complete project management for the construction of a new hydropower plant on an existing weir 1000 kW, Complete project management, France (74), 2020-2025 Feasibility study for the rehabilitation of four hydroelectric power plants on the Ill River 120 - 350 kW, Feasibility study, France (67), 2024-2025 Feasibility study for the refurbishment of an existing hydropower plant, conserving the historical turbine 55 kW, Feasibility study, France (07), 2025 Due diligence of an existing hydropowerplant 1000 kW, Due diligence, France (05), 2025 Feasibility study of an old mill in the Bourgogne state in France 500 W, Feasibility study, France (71), 2024 Assembly of the administrative licence renewal file for an existing power plant 800 kW, Authorisation application file, France (39), 2024 Hydroelectric feasibility study for the optimization of the Roche power plant 566 kW, Feasibility study, France (39), 2024 Hydroelectric feasibility study for the rehabilitation of a low head and high head former poxer plants 2 x 150 kW, Feasibility study, France (88), 2024 Pre-feasibility study following ADEME’s specifications 53 kW, Summary preliminary study, France (21), 2024-2025 Feasibility study for the refurbishment of a former hydropower station in Switzerland 70 kW, Feasibility study, Suisse, 2024-2025 Assessment of the fish mortality throw an existing hydropower plant 1100 kW, Territorial development scheme, France (46), 2024-2025 Feasibility study for the rehabilitation of an old power plant in north-west of France 20 kW, Feasibility study, France (27), 2023 Feasibility study in center of France for the rehabilitation of an old mill 13 kW, Feasibility study, France (89), 2023-2024 Feasibility study for the restoration of an old mill on the Somme river 14 kW, Feasibility study, France (71), 2023 Drafting a specification document for companies consultation for design/build HPP in Burundi 13 000 kW, Assistance to the Owner, Burundi, 2023 Feasibility study for the installation of a lifting pump 22 kW, Feasibility study, France (74), 2024 Support for the procurement of consultancy services for detailed engineering and supervision of a run-of-the-river dam project (44MW). 44 000 kW, Assistance to the Owner, Indonésie, 2023 Power plant operations supervision, detailed design studies and project management 400 kW, Work Execution Branch, France (39), 2022-2025 Preliminary Project Analysis and dimensioning of a fish pass for a power plant on the Loue River 400 kW, Summary preliminary study, France (39), 2021 Pre-porject study and compilation of administrative documentation for the rehabilitation of an old power plant on the Bienne river 500 kW, Summary preliminary study, France (39), 2022 Feasibility study for increasing the power of an existing power plant in the Doubs region 532 kW, Feasibility study, France (25), 2021 Feasibility study for the rehabilitation of an existing power plant in Ardèche 42 kW, Feasibility study, France (07), 2022 Hydropower potential assessment of the drinking water network of a city in the South East of France 13 - 115 kW, Feasibility study, France (06), 2023 Hydropower potential assessment of the drinking water network of a city in the French Alpes 20 - 40 kW, Feasibility study, France (74), 2022-2023 Feasibility study for the establishment of 3 new drinking water production plants on existing hydropower plants’ reservoir. 10 000 kW, Feasibility study, France (23), 2023-2024 Detailed design studies for the refurbishment of an old mill on the Cher River 22 kW, Detailed design study, France (23), 2023-2024 Feasibiliy and detailed design studies of 4 hydroelectric sites in Cogo Brazza 85 - 2 200 kW, Detailed design study, Congo, 2023 Feasibility study following ADEME guidelines for the rehabilitation of a mill on the Oudrache river. 19 kW, Feasibility study, France (71), 2023 Feasibility study following ADEME guidelines for the rehabilitation of a forge on the Somme river. 19 kW, Feasibility study, France (71), 2023 Technical assessment and calculation of the acquisition cost of a power plant from 1933 320 kW, Due diligence, France (87), 2023 Feasibility study for a new medium-head power plant in South Kivu, Democratic Republic of the Congo (DRC). 12 000 kW, Feasibility study, RDC, 2023 Feasibility study following ADEME guidelines for the rehabilitation of a mill on the Ognon river. 20 kW, Feasibility study, France (21), 2023 Preliminary project and authorization request for the construction of a power plant at the location of a former sawmill 144 kW, Summary preliminary study, France (38), 2021 Feasibility study for the refurbishment of an old mill on the Dree River 37 kW, Feasibility study, France (71), 2022 Detailed design studies for the refurbishment of an old mill on the Mouge River 31 kW, Detailed design study, France (71), 2022-2025 Cost estimate of 3 hydroelectric projects in Africa 400 kW, Territorial development scheme, RDC, 2022 Feasibility study for the rehabilitation of the hydroelectric power plant at Pont de lEtang on the Grosne River in Cluny 226 kW, Feasibility study, France (71), 2023 Identification of the potential for pumping and turbine utilization in Africa on behalf of the EU 87 GW, Territorial development scheme, Afrique, 2022 Compliance of a water intake 100 kW, Feasibility study, France (05), 2021 StreamDiver VS Double-Adjustment Vertical Kaplan 160 kW, Summary preliminary study, France (53), 2021 Technical Audit of the Ray-sur-Saône Hydroelectric Power Plant 130 kW, Due diligence, France (70), 2020 Feasibility study for the rehabilitation of an old mill on the Longviry River 100 kW, Feasibility study, France (39), 2020 Identification of the hydroelectric potential in the drinking water network (11 sites) 0.2-12, Feasibility study, France (06), 2021 Energy recovery study of two waterfalls in a fish plant 19 kW, Authorisation application file, France (26), 2022 Administrative file for the end of the concession period 800 kW, Feasibility study, France (11), 2022 Feasibility study and assistance to the owner in the French department of Haute Savoie (M) 1060 kW, Assistance to the Owner, France (74), 2022-2023 Feasibility study and assistance to the owner in the French department of Haute Savoie (CM) 1160 kW, Assistance to the Owner, France (74), 2022-2023 Hydraulic study for the Moulin Pinte site 8.5 kW, Feasibility study, France (42), 2021 Study of a micro-hydroelectric power plant on a potable water source 2.4 kW, Feasibility study, France (01), 2020 Micro hydroelectric power station on a Karstic source 15 kW, Feasibility study, France (07), 2022 Potential study for the refurbishment of a former hydropower plant 480 kW, Territorial development scheme, France (2A), 2021 Feasibility study for an old water mill in France 70 kW, Feasibility study, France (89), 2022 Due diligence of existing power plants in France 350 kW, Feasibility study, France (39), 2022 Due diligence and feasibility study of an existing power plant in Jura Mountain 500 kW, Feasibility study, France (39), 2022 Feasibility study of an old mill with a subsidence of the sill 140 kW, Feasibility study, France (71), 2022 Refurbishment of a former mill on the Auvezere River. 140 kW, Complete project management, France (24), 2021-2025 Feasibility study and preliminary project analysis for the rehabilitation of an old mill on the Grosne River 90 kW, Due diligence, France (71), 2021 Due diligence Saint-Génix hydro power plant 500 kW, Feasibility study, France (73), 2021 Due diligence of an existing power plant in the south of France 740 kW, Due diligence, France (11), 2021 Renewable energy resource mapping in Papua New Guinea -, Territorial development scheme, Papouasie-Nouvelle-Guinée, 2021-2022 Pre-feasibility study for the reclamation of a former sawmill 20 kW, Due diligence, France (74), 2021 Feasibility study for the rehabilitation of an old mill on the Blavet River 45 kW, Feasibility study, France (56), 2021 Reclamation of a former sawmill to produce electricity 15-46 kW, Feasibility study, France (88), 2021 Refurbishment of two former hydroelectric power plants on the Morge 370 kW, Feasibility study, France (38), 2021 Rehabilitation of a former mill on the Morge River in France 43 kW, Feasibility study, France (38), 2021 Due diligence of an existing power plant in France 1090 kW, Detailed design study, France (07), 2021 Feasibility study for an old mill 52 kW, Feasibility study, France (51), 2020 Water treatment plant outflow valorisation study 12 kW, Feasibility study, France (74), 2020-2021 Design and commissioning of two off-grid hydropower plants in Papua New Guinea 400 kW, Due diligence, Papouasie-Nouvelle-Guinée, 2020-2022 Hydroelectric equipment of an existing weir 150 kW, Complete project management, France (19), 2021-2025 3 feasibility studies for new project and an old mill in the North of France 325 kW, Feasibility study, France (80), 2021 Design study of a new medium head hydro scheme in the Vosges 500 kW, Summary preliminary study, France (88), 2020 Pre-feasibility for the rehabilitation of an old mill 15 kW, Summary preliminary study, France (01), 2020 Refurbishment of a 1000 kW low-head hydroelectric scheme 1000 kW, Summary preliminary study, France (25), 2020 Assistance to complete the application files for two new hydro plants 100 kW, Feasibility study, France (25), 2020 Legal recognition of the water rights for six old mills 1000 kW, Authorisation application file, France (25), 2019 Best use of irrigation canal available power 2000 kW, Summary preliminary study, France (05), 2019-2020 Feasibility study for the hydroelectric equipment of an existing weir downtown 500 kW, Feasibility study, France (25), 2019 Detailed design study of a low-head hydropower plant of 1,5 MW 1 500 kW, Feasibility study, France (74), 2019 Feasibility study for the rehabilitation of an old mill 60 kW, Summary preliminary study, France (84), 2020 Feasibility study for two old mills on the Yonne River 300 kW, Feasibility study, France (89), 2020 Detailed design studies of 2 new medium head projects 4500 kW, Feasibility study, France (74), 2019-2020 Rehabilitation of a 50 kW old water mill in western part of France 50 kW, Due diligence, France (56), 2019 Legal recognition of the water rights for three old mills 397 kW, Feasibility study, France (71), 2019 Due diligence of 14 hydroelectric schemes in French West Indies 10 000 kW, Feasibility study, France (97), 2019 Discharge measurement of two mountain stream located in the French Alps 5 000 kW, Detailed design study, France (73), 2019 Installation of underground Francis turbines 2800 kW, Summary preliminary study, Suisse, 2019 Turbining a minimum flow with a second-hand hydraulic turbine 15 kW, Feasibility study, France (39), 2019 Study of the hydroelectric potential of the Somme River in the north of France 30 - 160 kW, Due diligence, France (80), 2018-2019 Due diligence of a 130 kW scheme located on an old irrigation canal 130 kW, Territorial development scheme, France (07), 2018-2019 Expertise of the model and prototype efficiency hills of 2x62 MW Kaplan turbines 124 000 kW, Feasibility study, Ukraine, 2018-2019 Study of the hydroelectric potential of different weir in Bourgogne 2 200 kW, Due diligence, France (89), 2020 Refurbishment of two old hydroelectric schemes on the Orain River 53 kW, Summary preliminary study, France (39), 2019 Design study of 2 new high head hydroelectric schemes in the Alps 1 100 kW, Summary preliminary study, France (74), 2018-2019 Rehabilitation of an old hydroelectric scheme on a mountain stream 180 kW, Feasibility study, France (74), 2018-2019 Analysis of various turbine types for the Arves River near Geneva 960 kW, Summary preliminary study, Suisse, 2018 Preliminary design studies of three high head hydro projects in the French Alps 4240 kW, Due diligence, France (05), 2018-2019 Construction of a new 500 kW hydroelectric power plant in the Pyrenees mountains 500 kW, Feasibility study, France (64), 2017-2018 Study of the hydroelectric potential of Saint-Etienne Métropole 5 - 80 kW, Feasibility study, France (42), 2018 Expertise / due diligence of a 2 MW power plant 2000 kW, Due diligence, France (51), 2018 Refurbishment of an old hydroelectric scheme on the Sèvre Nantaise River 30 kW, Feasibility study, France (44), 2018 Expertise / due diligence of a 2 MW existing power plant 2000 kW, Feasibility study, Sao Tomé-et-Principe, 2018 Feasibility study for the rehabilitation of six hydropower plant 270 kW, Feasibility study, France (29), 2018-2019 Due diligence of a tender proposal for an international project 1 000 kW, Assistance to the owner, Rwanda, 2018 Rehabilitation of two old mills in the Jura Mountains 20 kW, Territorial development scheme, France (39), 2018 Refurbishment of an old hydroelectric scheme 80 kW, Feasibility study, France (25), 2017 EPC contract analysis for the equipment of two low head weirs 400 kW, Due diligence, France (25), 2016 - 2017 Due diligence of 13 small hydroelectric plants 7 200 kW, Feasibility study, France (08, 11, 12, 24, 43), 2017 High head discharge flow valorisation with a crossflow turbine 300 kW, Assistance to the Owner, France (38), 2017 Refurbishment of an old hydro power plant on the Volane River 45 kW, Due diligence, France (07), 2017 Feasibility study for the rehabilitation of an old sawmill 60 kW, Due diligence, France (70), 2018 Project management for the rehabilitation of a hydroelectric power plant 70 kW, Feasibility study, France (27), 2016 - 2018 Rehabilitation of a low head turbine within an industrial site 150 kW, Feasibility study, France (08), 2016 - 2017 Equipment of 4 m high spillway gates with a turbine 400 kW, Feasibility study, France (57), 2016 Equipment of 2 m high spillway gates with 2 turbines 350 kW, Summary preliminary study, France (70), 2016 - 2017 Detailed feasibility and design of an old mill refurbishment with brand new turbines 2 000 kW, Feasibility study, France (25), 2016 - 2017 Installation of a hydrodynamic screw on an existing discharge gate 20 kW, Feasibility study, France (58), 2016 Installation of turbines on several drinking water distribution systems 200 kW, Complete project management, France (35), 2017 Complete project management of the refurbishment and upgrade of an old plant 130 kW, Feasibility study, France (58), 2016 - 2017 Equipment of 2 m high 7 spillway gates with low head turbines 500 kW, Feasibility study, France (71), 2017 Detailed feasibility of a plant rehabilitation of an old plant 300 kW, Complete project management, France (07), 2016 - 2017 Detailed feasibility study for the complete optimization of two EDFs plants 2 300 kW, Feasibility study, France (74), 2015 - 2016 Rehabilitation of three low weirs on the Doubs River 500 kW, Summary preliminary study, France (25), 2015 - 2016 Feasibility study for a low head dam equipment 50 kW, Feasibility study, France (27), 2015 Feasibility study for the refurbishment of an old sawmill 75 kW, Feasibility study, France (01), 2015 Optimization of a power plant under operation 530 kW, Feasibility study, France (87), 2016 Assistance to the owner for a hydropower plant on drinking water system 450 kW, Summary preliminary study, France (64), 2018 Old hydroelectric plant refurbishment and modernization 55 kW, Feasibility study, France (34), 2015 Old water mill upgrade with low head turbines 250 kW, Feasibility study, France (71), 2015 Transient and stability analysis, technical specification of 7 new hydropower plants 53 500 kW, Work Execution Branch, Ouganda & Rwanda, 2016 - 2019 Due diligence of 10 hydroelectric plants under low and medium head 25 000 kW, Due diligence, Italie, 2015 Assistance for 4 VLH turbine supply contract negotiation 2 000 kW, Assistance to the Owner, France (73), 2015 Feasibility study for the rehabilitation of a horizontal Francis turbine 50 kW, Feasibility study, France (23), 2015 Refurbishment of a combined electricity production and drinking water pumping 40 kW, Feasibility study, France (74), 2015 - 2016 Complete project management of vertical Kaplan rehabilitation 2 500 kW, Complete project management, France (22), 2014 - 2016 Detailed feasibility study of a crossflow turbine or Archimedean screws 250 kW, Summary preliminary study, France (73), 2014 Technical assistance to the procurement, manufacturing, and erection of a Kaplan 320 kW, Complete project management, France (39), 2014 - 2015 Complete project management of the refurbishment and upgrade of an old plant (PASEC) 20 000 kW, Complete project management, Comores, 2016 - 2019 Detailed feasibility study for the construction of a new HEPP in Sierra Leone 10 000 kW, Summary preliminary study, Sierra Leone, 2016 Very low head hydroelectric scheme rehabilitation 110 kW, Feasibility study, France (37), 2015 Francis turbine replacement by a Kaplan, with more than doubled nominal flowrate 350 kW, Summary preliminary study, France (73), 2014 Assistance for turbines refurbishment contract negotiation 205 000 kW, Complete project management, Mali, 2014 Due diligences of 4 existing hydroelectric plants 30 000 kW, Due diligence, France (73), 2014 Complete project management of the refurbishment of 4 Kaplan units 1 500 kW, Complete project management, France (25), 2014 - 2016 Feasibility study of a private water mill rehabilitation 100 kW, Feasibility study, France (01), 2014 Detailed feasibility study of a new high head scheme in the Swiss Alps 8 000 kW, Summary preliminary study, Suisse, 2013 Detailed feasibility study of a hydroelectric power plant under operation 2 000 kW, Feasibility study, France (26), 2013 Hydromechanical and electrical equipment due diligence 1 500 kW, Summary preliminary study, France (85), 2013 Pre-feasibility study of various hydro projects (refurbishment or plants for sale) 150 kW, Due diligence, France (07, 26, 38, 73, 74), 2013 Complete project management of SAXO vertical Kaplan construction 200 kW, Complete project management, Suisse, 2014 - 2015 Detailed feasibility study of a Pelton turbine rehabilitation under 600 m head 12 000 kW, Summary preliminary study, France (73), 2013 Complete project management of the hydromechanical part for a rehabilitation 1 500 kW, Complete project management, France (73), 2014 - 2015 Feasibility study of the Montsapey scheme rehabilitation 2 500 kW, Summary preliminary study, France (73), 2012 - 2013 Two new projects of hydroelectric power plants in the upper part of Guinea 44 000 kW, Feasibility study, Guinée Conakry, 2013 Project management for electromechanical part of a high head scheme 3 800 kW, Complete project management, France (73), 2012 - 2014 Valorization of exhaust water flowrate from a Molybdenum plant 250 kW, Feasibility study, Chili, 2012 Old hydroelectric plant refurbishment and power increase 3 500 kW, Feasibility study, Suisse, 2012 - 2013 Water treatment plant outflow valorization study (74) 30 kW, Feasibility study, France (74), 2013 Refurbishment of two hydroelectric plant on the Doubs River 2 000 kW, Feasibility study, France (25), 2013 Project of hydroelectric power plant in Uganda 7 000 kW, Summary preliminary study, Ouganda, 2013 Renewal of the EDF/SHEM French hydroelectric concessions (Drac) 218 000 kW, Due diligence, France (38), 2012 - 2014 Renewal of the EDF/SHEM French hydroelectric concessions (Têt) 37 000 kW, Due diligence, France (66), 2012 - 2014 Tender documents of the High Grand Falls hydroelectric powerplant 500 000 kW, Due diligence, Kenya, 2012 Renewal of the EDF/SHEM French hydroelectric concessions (Ossau et Louron) 359 000 kW, Feasibility study, France (64), 2012 - 2014 Storage hydropower plants refurbishment and upgrade 2 050 kW, Due diligence, France (85), 2012 Refurbishment study of an old water mill on the Loir River 250 kW, Feasibility study, France (41), 2011 Project management for electromechanical part of a high head scheme in Maurienne 3 500 kW, Complete project management, France (73), 2011 - 2012 Feasibility study of a hydroelectric scheme located on a mountain stream 250 kW, Feasibility study, France (73), 2011 Optimization study of the hydroelectric plant of Rophemel dam 5 000 kW, Summary preliminary study, France (22), 2011 - 2012 Detailed studies and assistance to the demand for the water right renewal 50 kW, Authorisation application file, France (03), 2012 - 2014 Feasibility study of building a wind farm in Philippines 250 kW, Feasibility study, Philippines, 2009 Maragondon River feasibility studies of hydroelectric plants 1 000 kW, Feasibility study, Philippines, 2009 Feasibility study of a pico-hydroelectric plant 10 kW, Feasibility study, France (87), 2010 Feasibility study of an old water mill in a very old building 50 kW, Feasibility study, France (35), 2010 Existing medium head dam flow turbines study 1 000 kW, Feasibility study, France (2A et 2B), 2010 Pre-feasibility study of the major project of Sounda on the Kouilou River 800 000 kW, Due diligence, Congo, 2010 Overhaul feasibility study of four old mills and hydroelectric schemes 100 kW, Feasibility study, France (03), 2010 Water mill upgrade detailed feasibility study following a detailed tender 100 kW, Feasibility study, France (61), 2010 - 2011 Refurbishment of an old retired hydroelectric plant 70 kW, Feasibility study, France (25), 2007
Feasibility study for a new high head hydropowerplant in the French Alps 4500 kW, Feasibility study, France (73), 2024
Feasability study of an old mill in Monépiat, Ardèche, France 40 kW, Feasibility study, France (07), 2024
Complete project management for the refurbishment of a former sawmill 100 kW, Complete project management, France (01), 2022-2025
Complete project management for the construction of a new hydropower plant on an existing weir 1000 kW, Complete project management, France (74), 2020-2025
Feasibility study for the rehabilitation of four hydroelectric power plants on the Ill River 120 - 350 kW, Feasibility study, France (67), 2024-2025
Feasibility study for the refurbishment of an existing hydropower plant, conserving the historical turbine 55 kW, Feasibility study, France (07), 2025
Feasibility study of an old mill in the Bourgogne state in France 500 W, Feasibility study, France (71), 2024
Assembly of the administrative licence renewal file for an existing power plant 800 kW, Authorisation application file, France (39), 2024
Hydroelectric feasibility study for the optimization of the Roche power plant 566 kW, Feasibility study, France (39), 2024
Hydroelectric feasibility study for the rehabilitation of a low head and high head former poxer plants 2 x 150 kW, Feasibility study, France (88), 2024
Pre-feasibility study following ADEME’s specifications 53 kW, Summary preliminary study, France (21), 2024-2025
Feasibility study for the refurbishment of a former hydropower station in Switzerland 70 kW, Feasibility study, Suisse, 2024-2025
Assessment of the fish mortality throw an existing hydropower plant 1100 kW, Territorial development scheme, France (46), 2024-2025
Feasibility study for the rehabilitation of an old power plant in north-west of France 20 kW, Feasibility study, France (27), 2023
Feasibility study in center of France for the rehabilitation of an old mill 13 kW, Feasibility study, France (89), 2023-2024
Feasibility study for the restoration of an old mill on the Somme river 14 kW, Feasibility study, France (71), 2023
Drafting a specification document for companies consultation for design/build HPP in Burundi 13 000 kW, Assistance to the Owner, Burundi, 2023
Support for the procurement of consultancy services for detailed engineering and supervision of a run-of-the-river dam project (44MW). 44 000 kW, Assistance to the Owner, Indonésie, 2023
Power plant operations supervision, detailed design studies and project management 400 kW, Work Execution Branch, France (39), 2022-2025
Preliminary Project Analysis and dimensioning of a fish pass for a power plant on the Loue River 400 kW, Summary preliminary study, France (39), 2021
Pre-porject study and compilation of administrative documentation for the rehabilitation of an old power plant on the Bienne river 500 kW, Summary preliminary study, France (39), 2022
Feasibility study for increasing the power of an existing power plant in the Doubs region 532 kW, Feasibility study, France (25), 2021
Feasibility study for the rehabilitation of an existing power plant in Ardèche 42 kW, Feasibility study, France (07), 2022
Hydropower potential assessment of the drinking water network of a city in the South East of France 13 - 115 kW, Feasibility study, France (06), 2023
Hydropower potential assessment of the drinking water network of a city in the French Alpes 20 - 40 kW, Feasibility study, France (74), 2022-2023
Feasibility study for the establishment of 3 new drinking water production plants on existing hydropower plants’ reservoir. 10 000 kW, Feasibility study, France (23), 2023-2024
Detailed design studies for the refurbishment of an old mill on the Cher River 22 kW, Detailed design study, France (23), 2023-2024
Feasibiliy and detailed design studies of 4 hydroelectric sites in Cogo Brazza 85 - 2 200 kW, Detailed design study, Congo, 2023
Feasibility study following ADEME guidelines for the rehabilitation of a mill on the Oudrache river. 19 kW, Feasibility study, France (71), 2023
Feasibility study following ADEME guidelines for the rehabilitation of a forge on the Somme river. 19 kW, Feasibility study, France (71), 2023
Technical assessment and calculation of the acquisition cost of a power plant from 1933 320 kW, Due diligence, France (87), 2023
Feasibility study for a new medium-head power plant in South Kivu, Democratic Republic of the Congo (DRC). 12 000 kW, Feasibility study, RDC, 2023
Feasibility study following ADEME guidelines for the rehabilitation of a mill on the Ognon river. 20 kW, Feasibility study, France (21), 2023
Preliminary project and authorization request for the construction of a power plant at the location of a former sawmill 144 kW, Summary preliminary study, France (38), 2021
Feasibility study for the refurbishment of an old mill on the Dree River 37 kW, Feasibility study, France (71), 2022
Detailed design studies for the refurbishment of an old mill on the Mouge River 31 kW, Detailed design study, France (71), 2022-2025
Cost estimate of 3 hydroelectric projects in Africa 400 kW, Territorial development scheme, RDC, 2022
Feasibility study for the rehabilitation of the hydroelectric power plant at Pont de lEtang on the Grosne River in Cluny 226 kW, Feasibility study, France (71), 2023
Identification of the potential for pumping and turbine utilization in Africa on behalf of the EU 87 GW, Territorial development scheme, Afrique, 2022
StreamDiver VS Double-Adjustment Vertical Kaplan 160 kW, Summary preliminary study, France (53), 2021
Technical Audit of the Ray-sur-Saône Hydroelectric Power Plant 130 kW, Due diligence, France (70), 2020
Feasibility study for the rehabilitation of an old mill on the Longviry River 100 kW, Feasibility study, France (39), 2020
Identification of the hydroelectric potential in the drinking water network (11 sites) 0.2-12, Feasibility study, France (06), 2021
Energy recovery study of two waterfalls in a fish plant 19 kW, Authorisation application file, France (26), 2022
Administrative file for the end of the concession period 800 kW, Feasibility study, France (11), 2022
Feasibility study and assistance to the owner in the French department of Haute Savoie (M) 1060 kW, Assistance to the Owner, France (74), 2022-2023
Feasibility study and assistance to the owner in the French department of Haute Savoie (CM) 1160 kW, Assistance to the Owner, France (74), 2022-2023
Study of a micro-hydroelectric power plant on a potable water source 2.4 kW, Feasibility study, France (01), 2020
Potential study for the refurbishment of a former hydropower plant 480 kW, Territorial development scheme, France (2A), 2021
Due diligence and feasibility study of an existing power plant in Jura Mountain 500 kW, Feasibility study, France (39), 2022
Feasibility study of an old mill with a subsidence of the sill 140 kW, Feasibility study, France (71), 2022
Refurbishment of a former mill on the Auvezere River. 140 kW, Complete project management, France (24), 2021-2025
Feasibility study and preliminary project analysis for the rehabilitation of an old mill on the Grosne River 90 kW, Due diligence, France (71), 2021
Due diligence of an existing power plant in the south of France 740 kW, Due diligence, France (11), 2021
Renewable energy resource mapping in Papua New Guinea -, Territorial development scheme, Papouasie-Nouvelle-Guinée, 2021-2022
Pre-feasibility study for the reclamation of a former sawmill 20 kW, Due diligence, France (74), 2021
Feasibility study for the rehabilitation of an old mill on the Blavet River 45 kW, Feasibility study, France (56), 2021
Reclamation of a former sawmill to produce electricity 15-46 kW, Feasibility study, France (88), 2021
Refurbishment of two former hydroelectric power plants on the Morge 370 kW, Feasibility study, France (38), 2021
Rehabilitation of a former mill on the Morge River in France 43 kW, Feasibility study, France (38), 2021
Design and commissioning of two off-grid hydropower plants in Papua New Guinea 400 kW, Due diligence, Papouasie-Nouvelle-Guinée, 2020-2022
Hydroelectric equipment of an existing weir 150 kW, Complete project management, France (19), 2021-2025
3 feasibility studies for new project and an old mill in the North of France 325 kW, Feasibility study, France (80), 2021
Design study of a new medium head hydro scheme in the Vosges 500 kW, Summary preliminary study, France (88), 2020
Pre-feasibility for the rehabilitation of an old mill 15 kW, Summary preliminary study, France (01), 2020
Refurbishment of a 1000 kW low-head hydroelectric scheme 1000 kW, Summary preliminary study, France (25), 2020
Assistance to complete the application files for two new hydro plants 100 kW, Feasibility study, France (25), 2020
Legal recognition of the water rights for six old mills 1000 kW, Authorisation application file, France (25), 2019
Best use of irrigation canal available power 2000 kW, Summary preliminary study, France (05), 2019-2020
Feasibility study for the hydroelectric equipment of an existing weir downtown 500 kW, Feasibility study, France (25), 2019
Detailed design study of a low-head hydropower plant of 1,5 MW 1 500 kW, Feasibility study, France (74), 2019
Feasibility study for the rehabilitation of an old mill 60 kW, Summary preliminary study, France (84), 2020
Detailed design studies of 2 new medium head projects 4500 kW, Feasibility study, France (74), 2019-2020
Rehabilitation of a 50 kW old water mill in western part of France 50 kW, Due diligence, France (56), 2019
Legal recognition of the water rights for three old mills 397 kW, Feasibility study, France (71), 2019
Due diligence of 14 hydroelectric schemes in French West Indies 10 000 kW, Feasibility study, France (97), 2019
Discharge measurement of two mountain stream located in the French Alps 5 000 kW, Detailed design study, France (73), 2019
Turbining a minimum flow with a second-hand hydraulic turbine 15 kW, Feasibility study, France (39), 2019
Study of the hydroelectric potential of the Somme River in the north of France 30 - 160 kW, Due diligence, France (80), 2018-2019
Due diligence of a 130 kW scheme located on an old irrigation canal 130 kW, Territorial development scheme, France (07), 2018-2019
Expertise of the model and prototype efficiency hills of 2x62 MW Kaplan turbines 124 000 kW, Feasibility study, Ukraine, 2018-2019
Study of the hydroelectric potential of different weir in Bourgogne 2 200 kW, Due diligence, France (89), 2020
Refurbishment of two old hydroelectric schemes on the Orain River 53 kW, Summary preliminary study, France (39), 2019
Design study of 2 new high head hydroelectric schemes in the Alps 1 100 kW, Summary preliminary study, France (74), 2018-2019
Rehabilitation of an old hydroelectric scheme on a mountain stream 180 kW, Feasibility study, France (74), 2018-2019
Analysis of various turbine types for the Arves River near Geneva 960 kW, Summary preliminary study, Suisse, 2018
Preliminary design studies of three high head hydro projects in the French Alps 4240 kW, Due diligence, France (05), 2018-2019
Construction of a new 500 kW hydroelectric power plant in the Pyrenees mountains 500 kW, Feasibility study, France (64), 2017-2018
Study of the hydroelectric potential of Saint-Etienne Métropole 5 - 80 kW, Feasibility study, France (42), 2018
Refurbishment of an old hydroelectric scheme on the Sèvre Nantaise River 30 kW, Feasibility study, France (44), 2018
Expertise / due diligence of a 2 MW existing power plant 2000 kW, Feasibility study, Sao Tomé-et-Principe, 2018
Feasibility study for the rehabilitation of six hydropower plant 270 kW, Feasibility study, France (29), 2018-2019
Due diligence of a tender proposal for an international project 1 000 kW, Assistance to the owner, Rwanda, 2018
Rehabilitation of two old mills in the Jura Mountains 20 kW, Territorial development scheme, France (39), 2018
EPC contract analysis for the equipment of two low head weirs 400 kW, Due diligence, France (25), 2016 - 2017
Due diligence of 13 small hydroelectric plants 7 200 kW, Feasibility study, France (08, 11, 12, 24, 43), 2017
High head discharge flow valorisation with a crossflow turbine 300 kW, Assistance to the Owner, France (38), 2017
Refurbishment of an old hydro power plant on the Volane River 45 kW, Due diligence, France (07), 2017
Project management for the rehabilitation of a hydroelectric power plant 70 kW, Feasibility study, France (27), 2016 - 2018
Rehabilitation of a low head turbine within an industrial site 150 kW, Feasibility study, France (08), 2016 - 2017
Equipment of 2 m high spillway gates with 2 turbines 350 kW, Summary preliminary study, France (70), 2016 - 2017
Detailed feasibility and design of an old mill refurbishment with brand new turbines 2 000 kW, Feasibility study, France (25), 2016 - 2017
Installation of a hydrodynamic screw on an existing discharge gate 20 kW, Feasibility study, France (58), 2016
Installation of turbines on several drinking water distribution systems 200 kW, Complete project management, France (35), 2017
Complete project management of the refurbishment and upgrade of an old plant 130 kW, Feasibility study, France (58), 2016 - 2017
Equipment of 2 m high 7 spillway gates with low head turbines 500 kW, Feasibility study, France (71), 2017
Detailed feasibility of a plant rehabilitation of an old plant 300 kW, Complete project management, France (07), 2016 - 2017
Detailed feasibility study for the complete optimization of two EDFs plants 2 300 kW, Feasibility study, France (74), 2015 - 2016
Rehabilitation of three low weirs on the Doubs River 500 kW, Summary preliminary study, France (25), 2015 - 2016
Feasibility study for the refurbishment of an old sawmill 75 kW, Feasibility study, France (01), 2015
Assistance to the owner for a hydropower plant on drinking water system 450 kW, Summary preliminary study, France (64), 2018
Transient and stability analysis, technical specification of 7 new hydropower plants 53 500 kW, Work Execution Branch, Ouganda & Rwanda, 2016 - 2019
Due diligence of 10 hydroelectric plants under low and medium head 25 000 kW, Due diligence, Italie, 2015
Assistance for 4 VLH turbine supply contract negotiation 2 000 kW, Assistance to the Owner, France (73), 2015
Feasibility study for the rehabilitation of a horizontal Francis turbine 50 kW, Feasibility study, France (23), 2015
Refurbishment of a combined electricity production and drinking water pumping 40 kW, Feasibility study, France (74), 2015 - 2016
Complete project management of vertical Kaplan rehabilitation 2 500 kW, Complete project management, France (22), 2014 - 2016
Detailed feasibility study of a crossflow turbine or Archimedean screws 250 kW, Summary preliminary study, France (73), 2014
Technical assistance to the procurement, manufacturing, and erection of a Kaplan 320 kW, Complete project management, France (39), 2014 - 2015
Complete project management of the refurbishment and upgrade of an old plant (PASEC) 20 000 kW, Complete project management, Comores, 2016 - 2019
Detailed feasibility study for the construction of a new HEPP in Sierra Leone 10 000 kW, Summary preliminary study, Sierra Leone, 2016
Francis turbine replacement by a Kaplan, with more than doubled nominal flowrate 350 kW, Summary preliminary study, France (73), 2014
Assistance for turbines refurbishment contract negotiation 205 000 kW, Complete project management, Mali, 2014
Complete project management of the refurbishment of 4 Kaplan units 1 500 kW, Complete project management, France (25), 2014 - 2016
Feasibility study of a private water mill rehabilitation 100 kW, Feasibility study, France (01), 2014
Detailed feasibility study of a new high head scheme in the Swiss Alps 8 000 kW, Summary preliminary study, Suisse, 2013
Detailed feasibility study of a hydroelectric power plant under operation 2 000 kW, Feasibility study, France (26), 2013
Hydromechanical and electrical equipment due diligence 1 500 kW, Summary preliminary study, France (85), 2013
Pre-feasibility study of various hydro projects (refurbishment or plants for sale) 150 kW, Due diligence, France (07, 26, 38, 73, 74), 2013
Complete project management of SAXO vertical Kaplan construction 200 kW, Complete project management, Suisse, 2014 - 2015
Detailed feasibility study of a Pelton turbine rehabilitation under 600 m head 12 000 kW, Summary preliminary study, France (73), 2013
Complete project management of the hydromechanical part for a rehabilitation 1 500 kW, Complete project management, France (73), 2014 - 2015
Feasibility study of the Montsapey scheme rehabilitation 2 500 kW, Summary preliminary study, France (73), 2012 - 2013
Two new projects of hydroelectric power plants in the upper part of Guinea 44 000 kW, Feasibility study, Guinée Conakry, 2013
Project management for electromechanical part of a high head scheme 3 800 kW, Complete project management, France (73), 2012 - 2014
Valorization of exhaust water flowrate from a Molybdenum plant 250 kW, Feasibility study, Chili, 2012
Old hydroelectric plant refurbishment and power increase 3 500 kW, Feasibility study, Suisse, 2012 - 2013
Refurbishment of two hydroelectric plant on the Doubs River 2 000 kW, Feasibility study, France (25), 2013
Renewal of the EDF/SHEM French hydroelectric concessions (Drac) 218 000 kW, Due diligence, France (38), 2012 - 2014
Renewal of the EDF/SHEM French hydroelectric concessions (Têt) 37 000 kW, Due diligence, France (66), 2012 - 2014
Tender documents of the High Grand Falls hydroelectric powerplant 500 000 kW, Due diligence, Kenya, 2012
Renewal of the EDF/SHEM French hydroelectric concessions (Ossau et Louron) 359 000 kW, Feasibility study, France (64), 2012 - 2014
Refurbishment study of an old water mill on the Loir River 250 kW, Feasibility study, France (41), 2011
Project management for electromechanical part of a high head scheme in Maurienne 3 500 kW, Complete project management, France (73), 2011 - 2012
Feasibility study of a hydroelectric scheme located on a mountain stream 250 kW, Feasibility study, France (73), 2011
Optimization study of the hydroelectric plant of Rophemel dam 5 000 kW, Summary preliminary study, France (22), 2011 - 2012
Detailed studies and assistance to the demand for the water right renewal 50 kW, Authorisation application file, France (03), 2012 - 2014
Feasibility study of building a wind farm in Philippines 250 kW, Feasibility study, Philippines, 2009
Maragondon River feasibility studies of hydroelectric plants 1 000 kW, Feasibility study, Philippines, 2009
Feasibility study of an old water mill in a very old building 50 kW, Feasibility study, France (35), 2010
Pre-feasibility study of the major project of Sounda on the Kouilou River 800 000 kW, Due diligence, Congo, 2010
Overhaul feasibility study of four old mills and hydroelectric schemes 100 kW, Feasibility study, France (03), 2010
Water mill upgrade detailed feasibility study following a detailed tender 100 kW, Feasibility study, France (61), 2010 - 2011