Hydroelectric feasibility study for the rehabilitation of a low head and high head former poxer plants

France (88)

2024

2 x 150 kW

Feasibility study

Feasibility study for the refurbishment of two hydropower plants that powered a forge. Analysis of possible implementations, cost estimate, production assessment. Meeting with the French administration to define the administrative situation of the project.