Authorisation application file to increase the installed capacity of 2 existing hydropower plants in the French department of Jura

France (39)

2025-2026

406 kW et 395 kW

Authorisation application file

Drawing up of the authorisation application file to increase the installed capacity of two existing hydropower plants. Analysis of several technical solutions to implement a fish ladder on the intake weir of one of the hydropower plants. The river creates a gorge difficult to access during the construction work but also in operation making every solution hard to implement and maintain.