Detailed feasibility study of a crossflow turbine or Archimedean screws

France (73)

2014

250 kW

Summary preliminary study

Detailed feasibility study for the construction of a new hydroelectric scheme using water from a mountain stream with the aim of sizing the infrastructures and equipment to avoid a desilting basin.