Feasibility study for the rehabilitation of six hydropower plant

France (29)

2018-2019

270 kW

Feasibility study

Rehabilitation of six old power plant located on four locks, in an old flour mill converted into a museum and in an old butter mill under 2 to 3 m head. Total power calculation taking into account the tide phenomenon impacting one of the three sites.