Due diligence of 13 small hydroelectric plants

France (08, 11, 12, 24, 43)

2017

7 200 kW

Feasibility study

Due diligence of 13 hydroelectric power plants, with installed power from 400 kW to 1200 kW: analysis of the past production, schemes numerical model building incl. the dam, canal, penstock, turbine, generator, and connection to the grid.