Preliminary project and authorization request for the construction of a power plant at the location of a former sawmill

France (38)

2021

144 kW

Summary preliminary study

Development of a preliminary project and preparation of an authorization request dossier for the construction of a 144kW hydroelectric power plant on a mountain stream. The watercourse is classified as Category 1 and a biological reservoir, which necessitates in-depth studies on the bypassed reach, minimum flow requirements, and the project’s impacts on the fauna and flora.