Feasibility study of a very low head (1.40 m only) rehabilitation with the aim of keeping the main hydraulic infrastructures and highlighting the most appropriate upgrade scenario.

Very low head hydroelectric scheme rehabilitation
France (37)
2015
110 kW
Feasibility study
