Due diligence and feasibility study of an existing power plant in Jura Mountain

France (39)

2022

500 kW

Feasibility study

Due diligence of an old hydro power plant (1924) with an 8m height dam, a penstock and 2 Francis turbine under 30 m height. Analysis of the production records and development of several scenarios of rehabilitation in order to increase the power and change the purchase contract of electricity. Following this expertise, HYDREOLE conducted a feasibility study for a scenario of increased capacity and the installation of a new power plant.