Detailed design studies of 2 new medium head projects

France (74)

2019-2020

4500 kW

Feasibility study

Detailed preliminary designs of two new hydroelectric projects (medium head between 80 and 100 m) in the north of the Alps, of 2.0 MW and 2.5 MW respectively: Design of each infrastructure (fish pass, intake, desilting basin, load chamber, penstock, powerhouse, hydro-mechanical and electrical equipment, connection to the grid) and financial analysis.