Pre-feasibility study for the reclamation of a former sawmill

France (74)

2021

20 kW

Due diligence

Original turbine still operational, but weir and forebay destroyed. Hydrology analysis and flow measurement, Assessment of the original mechanical power thanks to the penstock diameter, Analysis of two scenarios: refurbishment or replacement of the penstock, Evaluation of the energy production, the annual average production income, the construction costs, and the investment payback.