Feasibility study for the refurbishment of an existing hydropower plant, conserving the historical turbine

France (07)

2025

55 kW

Feasibility study

The site has recently been purchased. Hydreole has tasked with studying different rehabilitation scenarios : refurbishment of the existing turbine, replacement of the turbine to qualify for a “H16 renovation” contract or to a “H16.neuf” contract.