Feasibility study of an old mill in the Bourgogne state in France

France (71)

2024

500 W

Feasibility study

As part of a study conducted under the specifications set by ADEME, Hydreole carried out a prefeasibility study for the rehabilitation of an old mill powered by a spring. This included a hydrological analysis of the site and an assessment of the potential for installing a turbine at the location of the former mill.