Pre-feasibility study following ADEME’s specifications

France (21)

2024-2025

53 kW

Summary preliminary study

Pre-feasibility study for the hydroelectric equipment of a former forge installed between two mills on a branch of the Ource river. Drafting of the specifications for the selection of a surveyor, and the administrative recognition of the perpetual right to use water energy.