Feasibility study following ADEME’s specifications and authorisation application file for the refurbishment of an old sawmill. The aim of the project is to turbine the full head available, historically harnessed by 2 cascading power plants. A specific study was carried on the modulation of the sanitary flow to maintain aquatic life during high water temperature waves.

Feasibility study and authorisation application file for the refurbishment of an old sawmill
France (39)
2026
79 kW
Authorisation application file