Feasibility study and assistance to the owner in order to start the administrative procedure for the rehabilitation of the site. The former plant is in the perimeter of a National Natural Reserve. A part of the study focused on the interactions between the hydropower plant and the wetland to preserve it.

Feasibility study for the rehabilitation of a former hydropower plant on the Rhin Tortu River
France (67)
2025-2026
89 kW
Feasibility study