A 10 m heigh dam allowed the former mill to produce energy. But since the end of the exploitation, he has caved in, and the river is back to its original riverbed. The objective of the study is to compare several scenarios for the implementation of a hydroelectric power plant on the site in order to find the best configuration regarding the local topography. The study was limited to the piece of land owned by the client.

Potential study for the refurbishment of a former hydropower plant
France (2A)
2021
480 kW
Territorial development scheme