Assistance to the owner for a hydropower plant on drinking water system

France (64)

2018

450 kW

Summary preliminary study

Feasibility of the installation of a Pelton turbine on the drinking water system. Assistance for the selection of a financial partner able to design and build the plant. Assistance for the selection of the owner engineer for the rehabilitation of the drinking water system.