Detailed technical expertise of a 2 MW power plant equipped with 4 Francis turbines under a low head: equipment assessment, operating and maintenance program recommendation, installed power optimization.

Expertise / due diligence of a 2 MW power plant
France (51)
2018
2000 kW
Due diligence
