Feasibility study for the refurbishment of a former hydropower station in Switzerland

Suisse

2024-2025

70 kW

Feasibility study

The economic, technical and administrative aspects of the project were studied at a feasibility stage, as well as the refurbishment and adaptation of the existing equipment.