Feasibility study for the rehabilitation of an old mill on the Blavet River

France (56)

2021

45 kW

Feasibility study

Our client entrusted us with the mission of determining the hydroelectric potential of an old mill on the Blavet River in Brittany. The goal was to estimate the production capacity of the future site in order to determine a purchase price for all the installations.