Location study, hydrological survey, supervision of the preliminary geological survey, hydraulic modelling, design of the civil structures and equipment, cost estimation, drawings, application for administrative authorization, tender documents.
Detailed design study of a low-head hydropower plant of 1,5 MW
France (74)
2019
1 500 kW
Feasibility study