HYDREOLE carried out a full feasibility study for the former Monépiat mill, located on the Dunière River in the Ardèche region. In parallel with the study, a dossier was also prepared to support the recognition of water rights based on historical use, including the calculation of its legal capacity.

Feasability study of an old mill in Monépiat, Ardèche, France
France (07)
2024
40 kW
Feasibility study
