Skip to main content
Home
Works
Team
Projects
Easydro
Contact
Home
Works
Team
Projects
Easydro
Contact
Nos projets
Tout
- de 1 MW
+ de 1 MW
Etudes
Maîtrise d’œuvre
France
International
Refurbishment of an old retired hydroelectric plant
France (25)
70 kW / Feasibility study
Feasibility study of building a wind farm in Philippines
Philippines
250 kW / Feasibility study
Maragondon River feasibility studies of hydroelectric plants
Philippines
1 000 kW / Feasibility study
Feasibility study of a pico-hydroelectric plant
France (87)
10 kW / Feasibility study
Feasibility study of an old water mill in a very old building
France (35)
50 kW / Feasibility study
Existing medium head dam flow turbines study
France (2A et 2B)
1 000 kW / Feasibility study
Pre-feasibility study of the major project of Sounda on the Kouilou River
Congo
800 000 kW / Due diligence
Overhaul feasibility study of four old mills and hydroelectric schemes
France (03)
100 kW / Feasibility study
Water mill upgrade detailed feasibility study following a detailed tender
France (61)
100 kW / Feasibility study
Rehabilitation of an old water mill, in a medium size city downtown
France (25)
100 kW / Summary preliminary study
Refurbishment study of an old water mill on the Loir River
France (41)
250 kW / Feasibility study
Project management for electromechanical part of a high head scheme in Maurienne
France (73)
3 500 kW / Complete project management
Feasibility study of a hydroelectric scheme located on a mountain stream
France (73)
250 kW / Feasibility study
Optimization study of the hydroelectric plant of Rophemel dam
France (22)
5 000 kW / Summary preliminary study
Detailed studies and assistance to the demand for the water right renewal
France (03)
50 kW / Authorisation application file
Renewal of the EDF/SHEM French hydroelectric concessions (Drac)
France (38)
218 000 kW / Due diligence
Renewal of the EDF/SHEM French hydroelectric concessions (Têt)
France (66)
37 000 kW / Due diligence
Tender documents of the High Grand Falls hydroelectric powerplant
Kenya
500 000 kW / Due diligence
Renewal of the EDF/SHEM French hydroelectric concessions (Ossau et Louron)
France (64)
359 000 kW / Feasibility study
Storage hydropower plants refurbishment and upgrade
France (85)
2 050 kW / Due diligence
Feasibility study of the Montsapey scheme rehabilitation
France (73)
2 500 kW / Summary preliminary study
Two new projects of hydroelectric power plants in the upper part of Guinea
Guinée Conakry
44 000 kW / Feasibility study
Project management for electromechanical part of a high head scheme
France (73)
3 800 kW / Complete project management
Valorization of exhaust water flowrate from a Molybdenum plant
Chili
250 kW / Feasibility study
Old hydroelectric plant refurbishment and power increase
Suisse
3 500 kW / Feasibility study
Water treatment plant outflow valorization study (74)
France (74)
30 kW / Feasibility study
Refurbishment of two hydroelectric plant on the Doubs River
France (25)
2 000 kW / Feasibility study
Project of hydroelectric power plant in Uganda
Ouganda
7 000 kW / Summary preliminary study
Detailed feasibility study of a new high head scheme in the Swiss Alps
Suisse
8 000 kW / Summary preliminary study
Detailed feasibility study of a hydroelectric power plant under operation
France (26)
2 000 kW / Feasibility study
Hydromechanical and electrical equipment due diligence
France (85)
1 500 kW / Summary preliminary study
Pre-feasibility study of various hydro projects (refurbishment or plants for sale)
France (07, 26, 38, 73, 74)
150 kW / Due diligence
Complete project management of "SAXO" vertical Kaplan construction
Suisse
200 kW / Complete project management
Detailed feasibility study of a Pelton turbine rehabilitation under 600 m head
France (73)
12 000 kW / Summary preliminary study
Complete project management of the hydromechanical part for a rehabilitation
France (73)
1 500 kW / Complete project management
Francis turbine replacement by a Kaplan, with more than doubled nominal flowrate
France (73)
350 kW / Summary preliminary study
Assistance for turbines refurbishment contract negotiation
Mali
205 000 kW / Complete project management
Due diligences of 4 existing hydroelectric plants
France (73)
30 000 kW / Due diligence
Complete project management of the refurbishment of 4 Kaplan units
France (25)
1 500 kW / Complete project management
Feasibility study of a private water mill rehabilitation
France (01)
100 kW / Feasibility study
Complete project management of vertical Kaplan rehabilitation
France (22)
2 500 kW / Complete project management
Detailed feasibility study of a crossflow turbine or Archimedean screws
France (73)
250 kW / Summary preliminary study
Technical assistance to the procurement, manufacturing, and erection of a Kaplan
France (39)
320 kW / Complete project management
Complete project management of the refurbishment and upgrade of an old plant (PASEC)
Comores
20 000 kW / Complete project management
Detailed feasibility study for the construction of a new HEPP in Sierra Leone
Sierra Leone
10 000 kW / Summary preliminary study
Very low head hydroelectric scheme rehabilitation
France (37)
110 kW / Feasibility study
Old hydroelectric plant refurbishment and modernization
France (34)
55 kW / Feasibility study
Old water mill upgrade with low head turbines
France (71)
250 kW / Feasibility study
Transient and stability analysis, technical specification of 7 new hydropower plants
Ouganda & Rwanda
53 500 kW / Work Execution Branch
Due diligence of 10 hydroelectric plants under low and medium head
Italie
25 000 kW / Due diligence
Assistance for 4 VLH turbine supply contract negotiation
France (73)
2 000 kW / Assistance to the Owner
Feasibility study for the rehabilitation of a horizontal Francis turbine
France (23)
50 kW / Feasibility study
Refurbishment of a combined electricity production and drinking water pumping
France (74)
40 kW / Feasibility study
Improvement of the transient response of 3 Francis turbines
France (74)
1 600 kW / Summary preliminary study
Detailed feasibility study for the complete optimization of two EDF's plants
France (74)
2 300 kW / Feasibility study
Rehabilitation of three low weirs on the Doubs River
France (25)
500 kW / Summary preliminary study
Feasibility study for a low head dam equipment
France (27)
50 kW / Feasibility study
Feasibility study for the refurbishment of an old sawmill
France (01)
75 kW / Feasibility study
Optimization of a power plant under operation
France (87)
530 kW / Feasibility study
Assistance to the owner for a hydropower plant on drinking water system
France (64)
450 kW / Summary preliminary study
Installation of a hydrodynamic screw on an existing discharge gate
France (58)
20 kW / Feasibility study
Installation of turbines on several drinking water distribution systems
France (35)
200 kW / Complete project management
Complete project management of the refurbishment and upgrade of an old plant
France (58)
130 kW / Feasibility study
Equipment of 2 m high 7 spillway gates with low head turbines
France (71)
500 kW / Feasibility study
Detailed feasibility of a plant rehabilitation of an old plant
France (07)
300 kW / Complete project management
Project management for the rehabilitation of a hydroelectric power plant
France (27)
70 kW / Feasibility study
Rehabilitation of a low head turbine within an industrial site
France (08)
150 kW / Feasibility study
Equipment of 4 m high spillway gates with a turbine
France (57)
400 kW / Feasibility study
Equipment of 2 m high spillway gates with 2 turbines
France (70)
350 kW / Summary preliminary study
Detailed feasibility and design of an old mill refurbishment with brand new turbines
France (25)
2 000 kW / Feasibility study
Due diligence of 4 low and medium head hydroelectric schemes
France (07)
500 kW / Feasibility study
Refurbishment of an old hydroelectric scheme
France (25)
80 kW / Feasibility study
EPC contract analysis for the equipment of two low head weirs
France (25)
400 kW / Due diligence
Due diligence of 13 small hydroelectric plants
France (08, 11, 12, 24, 43)
7 200 kW / Feasibility study
High head discharge flow valorisation with a crossflow turbine
France (38)
300 kW / Assistance to the Owner
Refurbishment of an old hydro power plant on the Volane River
France (07)
45 kW / Due diligence
Feasibility study for the rehabilitation of an old sawmill
France (70)
60 kW / Due diligence
Construction of a new 500 kW hydroelectric power plant in the Pyrenees mountains
France (64)
500 kW / Feasibility study
Study of the hydroelectric potential of Saint-Etienne Métropole
France (42)
5 - 80 kW / Feasibility study
Expertise / due diligence of a 2 MW power plant
France (51)
2000 kW / Due diligence
Refurbishment of an old hydroelectric scheme on the Sèvre Nantaise River
France (44)
30 kW / Feasibility study
Expertise / due diligence of a 2 MW existing power plant
Sao Tomé-et-Principe
2000 kW / Feasibility study
Feasibility study for the rehabilitation of six hydropower plant
France (29)
270 kW / Feasibility study
Due diligence of a tender proposal for an international project
Rwanda
1 000 kW / Assistance to the owner
Rehabilitation of two old mills in the Jura Mountains
France (39)
20 kW / Territorial development scheme
Refurbishment of two old hydroelectric schemes on the Orain River
France (39)
53 kW / Summary preliminary study
Design study of 2 new high head hydroelectric schemes in the Alps
France (74)
1 100 kW / Summary preliminary study
Rehabilitation of an old hydroelectric scheme on a mountain stream
France (74)
180 kW / Feasibility study
Analysis of various turbine types for the Arves River near Geneva
Suisse
960 kW / Summary preliminary study
Preliminary design studies of three high head hydro projects in the French Alps
France (05)
4240 kW / Due diligence
Study of the hydroelectric potential of the Somme River in the north of France
France (80)
30 - 160 kW / Due diligence
Due diligence of a 130 kW scheme located on an old irrigation canal
France (07)
130 kW / Territorial development scheme
Expertise of the model and prototype efficiency hills of 2x62 MW Kaplan turbines
Ukraine
124 000 kW / Feasibility study
Study of the hydroelectric potential of different weir in Bourgogne
France (89)
2 200 kW / Due diligence
Technical specification of a 600 MW pumped-storage scheme
Inde
600 MW / Feasibility study
Rehabilitation of a 50 kW old water mill in western part of France
France (56)
50 kW / Due diligence
Legal recognition of the water rights for three old mills
France (71)
397 kW / Feasibility study
Due diligence of 14 hydroelectric schemes in French West Indies
France (97)
10 000 kW / Feasibility study
Discharge measurement of two mountain stream located in the French Alps
France (73)
5 000 kW / Detailed design study
Installation of underground Francis turbines
Suisse
2800 kW / Summary preliminary study
Turbining a minimum flow with a second-hand hydraulic turbine
France (39)
15 kW / Feasibility study
Legal recognition of the water rights for six old mills
France (25)
1000 kW / Authorisation application file
Best use of irrigation canal available power
France (05)
2000 kW / Summary preliminary study
Feasibility study for the hydroelectric equipment of an existing weir downtown
France (25)
500 kW / Feasibility study
Feasibility study for the rehabilitation of an old mill
France (84)
60 kW / Summary preliminary study
Feasibility study for two old mills on the Yonne River
France (89)
300 kW / Feasibility study
Detailed design studies of 2 new medium head projects
France (74)
4500 kW / Feasibility study
Design study of a new medium head hydro scheme in the Vosges
France (88)
500 kW / Summary preliminary study
Pre-feasibility for the rehabilitation of an old mill
France (01)
15 kW / Summary preliminary study
Refurbishment of a 1'000 kW low-head hydroelectric scheme
France (25)
1000 kW / Summary preliminary study
Assistance to complete the application files for two new hydro plants
France (25)
100 kW / Feasibility study
Feasibility study for an old mill
France (51)
52 kW / Feasibility study
Water treatment plant outflow valorisation study
France (74)
12 kW / Feasibility study
Expertise of a hydroelectric power plant on Arve River
France (74)
1600 kW / Feasibility study
Design and commissioning of two off-grid hydropower plants in Papua New Guinea
Papouasie-Nouvelle-Guinée
400 kW / Due diligence
Hydroelectric equipment of an existing weird
France (19)
163 kW / Feasibility study
3 feasibility studies for new project and an old mill in the North of France
France (80)
325 kW / Feasibility study
Feasibility study for the rehabilitation of an old power plant
France (27)
22 kW / Feasibility study
Pre-feasibility study for the reclamation of a former sawmill
France (74)
20 kW / Due diligence
Feasibility study for the rehabilitation of an old mill on the Blavet River
France (56)
45 kW / Feasibility study
Reclamation of a former sawmill to produce electricity
France (88)
15-46 kW / Feasibility study
Refurbishment of two former hydroelectric power plants on the Morge
France (38)
370 kW / Feasibility study
Rehabilitation of a former mill on the Morge River in France
France (38)
43 kW / Feasibility study
Due diligence of an existing power plant in France
France (07)
1090 kW / Detailed design study
Reclamation of a former mill for electrical self-consumption
France (24)
140 kW / Due diligence
Feasibility study and preliminary project analysis for the rehabilitation of an old mill on the Grosne River
France (71)
90 kW / Due diligence
Due diligence - Saint-Génix hydro power plant
France (73)
500 kW / Feasibility study
Due diligence of an existing power plant in the south of France
France (11)
740 kW / Due diligence
Renewable energy resource mapping in Papua New Guinea
Papouasie-Nouvelle-Guinée
- / Territorial development scheme
Potential study for the refurbishment of a former hydropower plant
France (2A)
480 kW / Territorial development scheme
Due diligence of a future power plant in the French Alps
France (38)
500 kW / Complete project management
Feasibility study for an old water mill in France
France (89)
70 kW / Feasibility study
Due diligence and feasibility study of an existing power plant in Jura Mountain
France (39)
500 kW / Feasibility study
Feasibility study of an old mill with a subsidence of the sill
France (71)
140 kW / Feasibility study
Due diligence of existing power plants in France
France (39)
350 kW / Feasibility study
Energy recovery study of two waterfalls in a fish plant
France (26)
19 kW / Authorisation application file
Administrative file for the end of the concession period
France (11)
800 kW / Feasibility study
Feasibility study and assistance to the owner in the French department of Haute Savoie (M)
France (74)
1060 kW / Assistance to the Owner
Feasibility study and assistance to the owner in the French department of Haute Savoie (CM)
France (74)
1160 kW / Assistance to the Owner
Micro hydroelectric power station on a Karstic source
France (07)
15 kW / Feasibility study
Hydraulic study for the Moulin Pinte site
France (42)
1 kW / Feasibility study
Study of a micro-hydroelectric power plant on a potable water source
France (01)
2.4 kW / Feasibility study
Feasibility study for the rehabilitation of the hydroelectric power plant at Pont de l'Etang on the Grosne River in Cluny
France (71)
226 kW / Feasibility study
Identification of the potential for pumping and turbine utilization in Africa on behalf of the EU
Afrique
1000 kW / Territorial development scheme
Compliance of a water intake
France (05)
100 kW / Feasibility study
StreamDiver VS Double-Adjustment Vertical Kaplan
France (53)
160 kW / Summary preliminary study
Technical Audit of the Ray-sur-Saône Hydroelectric Power Plant
France (70)
130 kW / Due diligence
Feasibility study for the rehabilitation of an old mill on the Longviry River
France (39)
100 kW / Feasibility study
Identification of the hydroelectric potential in the drinking water network (11 sites)
France (06)
0.2-12 / Feasibility study
Preliminary project and authorization request for the construction of a power plant at the location of a former sawmill
France (38)
144 kW / Summary preliminary study
Feasibility study for the refurbishment of an old mill on the Dree River
France (71)
37 kW / Feasibility study
Feasibility study for the refurbishment of an old mill on the Mouge River
France (71)
31 kW / Feasibility study
Feasibility study for the refurbishment of an old mill on the Arconce River
France (71)
60 kW / Feasibility study
Technical assessment and calculation of the acquisition cost of a power plant from 1933
France (87)
320 kW / Due diligence
Feasibility study for a new medium-head power plant in South Kivu, Democratic Republic of the Congo (DRC).
RDC
12 000 kW / Feasibility study
Feasibility study following ADEME guidelines for the rehabilitation of a mill on the Oudrache river.
France (71)
19 kW / Feasibility study
Feasibility study following ADEME guidelines for the rehabilitation of a forge on the Somme river.
France (71)
19 kW / Feasibility study
Feasibility study following ADEME guidelines for the rehabilitation of a mill on the Ognon river.
France (21)
20 kW / Feasibility study
Hydropower potential assessment of the drinking water network of a city in the South East of France
France (06)
13 - 115 kW / Feasibility study
Hydropower potential assessment of the drinking water network of a city in the French Alpes
France (74)
20 - 40 kW / Feasibility study
Feasibility study for the establishment of 3 new drinking water production plants on existing hydropower plants’ reservoir.
France (23)
10 000 kW / Feasibility study
Feasibility study and recognition of legal rights for the rehabilitation of a former mill in the French department Creuse
France (23)
22 kW / Feasibility study
Feasibiliy and detailed design studies of 4 hydroelectric sites in Cogo Brazza
Congo
85 - 2 200 kW / Detailed design study
Support for the procurement of consultancy services for detailed engineering and supervision of a run-of-the-river dam project (44MW).
Indonésie
44 000 kW / Assistance to the Owner
Pre-porject study and compilation of administrative documentation for the rehabilitation of an old power plant on the Bienne river
France (39)
500 kW / Summary preliminary study
Preliminary Project Analysis and dimensioning of a fish pass for a power plant on the Loue River
France (39)
400 kW / Summary preliminary study
Feasibility study for increasing the power of an existing power plant in the Doubs region
France (25)
532 kW / Feasibility study
Feasibility study for the rehabilitation of an existing power plant in Ardèche
France (07)
42 kW / Feasibility study
Feasibility study for the rehabilitation of an old power plant in north-west of France
France (27)
20 kW / Feasibility study
Feasibility study in center of France for the rehabilitation of an old mill
France (89)
13 kW / Feasibility study
Feasibility study for the restoration of an old mill on the Somme river
France (71)
14 kW / Feasibility study
Feasibility study for the restoration of an old mill on the Natouze river
France (71)
16 kW / Feasibility study
Drafting a specification document for companies' consultation for design/build HPP in Burundi
Burundi
13 000 kW / Assistance to the Owner