Skip to main content

Hydroelectric equipment of an existing weir

  • France (19)
  • 2021-2025
  • 150 kW
  • Complete project management
  • Detailed design studies for the equipment of an existing weir with 2 hydrodynamic screws. Analysis of the existing fish pass and design of a new one to improve fish migration. Complete project management during construction work.