Skip to main content

Detailed design studies for the refurbishment of an old mill on the Cher River

  • France (23)
  • 2023-2024
  • 22 kW
  • Detailed design study
  • The old mill has been converted into a spinning factory. To reduce its energy and water consumption, the factory aims to refurbish the former mill with a hydroelectric turbine. HYDREOLE carried out the feasibility and detailed design studies for the refurbishment of the mill. HYDREOLE has been commissioned to prepare the administrative file for the project authorisation.