Skip to main content

Detailed design studies for the refurbishment of an old mill on the Mouge River

  • France (71)
  • 2022-2025
  • 31 kW
  • Detailed design study
  • After the feasibility study for the refurbishment of the site carried out following the specification of the ADEME, HYDREOLE performed the detailed design studies of the project. The perpetual right to use water energy was recognised and a campaign of flow measurements was carried out during detailed studies