Detailed design studies for the refurbishment of an old mill on the Arconce River

  • France (71)
  • 2022-2025
  • 60 kW
  • Detailed design study
  • Feasibility study for the refurbishment of an old mill on the Arconce River. Detailed design studies of the hydropower plant and its fish ladder. 2D hydraulic modelling of the river section that might be impacted by the increase of the weir elevation. Consultative meeting with the French administration to prepare the authorisation procedure.