Feasibility study for the rehabilitation of four hydroelectric power plants on the Ill River

- France (67)
- 2024-2025
- 120 - 350 kW
- Feasibility study
- Feasibility study for the rehabilitation of four existing sites, three of which are located in the historic heart of Strasbourg. Due to significant landscape constraints and the client’s requirements, the choice of equipment was oriented towards fish-friendly turbines. An administrative analysis of the various historical water rights was also carried out for all four sites.