Detailed due diligence of all the scheme's equipment (penstock, gates, turbines, generators, electrical cabinets, automation, grid connection, grid capacity) of an existing 2 MW HEPP under 500 m head in Sao Tome-and-Principe. Optimization scenarios research and description.