Original turbine still operational, but weir and forebay destroyed. Hydrology analysis and flow measurement, Assessment of the original mechanical power thanks to the penstock diameter, Analysis of two scenarios: refurbishment or replacement of the penstock, Evaluation of the energy production, the annual average production income, the construction costs, and the investment payback.