Skip to main content

Feasibility study for the refurbishment of a former hydropower station in Switzerland

  • Suisse
  • 2024-2025
  • 70 kW
  • Feasibility study
  • The economic, technical and administrative aspects of the project were studied at a feasibility stage, as well as the refurbishment and adaptation of the existing equipment.