Skip to main content

Hydroelectric feasibility study for the rehabilitation of a low head and high head former poxer plants

  • France (88)
  • 2024
  • 2 x 150 kW
  • Feasibility study
  • Feasibility study for the refurbishment of two hydropower plants that powered a forge. Analysis of possible implementations, cost estimate, production assessment. Meeting with the French administration to define the administrative situation of the project.