Preliminary Project Analysis and dimensioning of a fish pass for a power plant on the Loue River
France (39)
2021
400 kW
Summary preliminary study
Carrying out a preliminary project study as part of increasing the power of an existing plant. HYDREOLE has developed several scenarios, particularly regarding the number and type of turbines as well as the possibility of using the reserved flow. HYDREOLE also conducted a dimensioning study of a fish pass with rock filling at the preliminary project stage.