Skip to main content

Water treatment plant outflow valorisation study

  • France (74)
  • 2020-2021
  • 12 kW
  • Feasibility study
  • Pre-feasibility study for equipping a water treatment plant outflow in France. Determination of discharges rejected by the WTP. Research of the various data available on the existing equipment (gross head, location of the discharge pipe, type of pipe, etc.). Study of the various possible scenarios and the location of the plant.