Skip to main content

Very low head hydroelectric scheme rehabilitation

  • France (37)
  • 2015
  • 110 kW
  • Feasibility study
  • Feasibility study of a very low head (1.40 m only) rehabilitation with the aim of keeping the main hydraulic infrastructures and highlighting the most appropriate upgrade scenario.