Skip to main content

Technical Audit of the Ray-sur-Saône Hydroelectric Power Plant

  • France (70)
  • 2020
  • 130 kW
  • Due diligence
  • Expertise of an existing power plant aimed at analysing its productivity and profitability by comparing it to simulated models. This allows identifying any malfunctions of the plant, assessing costs, and determining the maintenance frequency of the facility.