Skip to main content

Rehabilitation of an old water mill, in a medium size city downtown

  • France (25)
  • 2011
  • 100 kW
  • Summary preliminary study
  • Feasibility study following a detailed tender issued by the ADEME: plant sizing, cost estimates and financial optimization of the technical selected data. Detailed environmental analysis.