Skip to main content

Rehabilitation of a former mill on the Morge River in France

  • France (38)
  • 2021
  • 43 kW
  • Feasibility study
  • Determination of the legal consistency of the original right to derive water, taking into account historical documents and the remaining equipment. Feasibility study (hydrology, head, energy capacity, description of the work, cost etc.). Biological flow rate sensibility study. Comparison of several solutions for the ecological restoration and dimensioning of the fish ladders.