Skip to main content

Refurbishment of two old hydroelectric schemes on the Orain River

  • France (39)
  • 2019
  • 53 kW
  • Summary preliminary study
  • Legal recognition of the water rights. Feasibility of the refurbishment of the mills. Economic appropriateness of a direct use of generated electricity.