Skip to main content

Refurbishment of an old hydroelectric scheme on the Sèvre Nantaise River

  • France (44)
  • 2018
  • 30 kW
  • Feasibility study
  • Refurbishment of an old hydroelectric scheme on the Sèvre Nantaise River. Collaboration with the consulting company in charge of the restoration of the ecological continuity in the river.