Skip to main content

Refurbishment of a combined electricity production and drinking water pumping

  • France (74)
  • 2015 - 2016
  • 40 kW
  • Feasibility study
  • Comparison of technical and economic advantages and drawbacks of electricity delivery to the grid or feeding of a direct drive pumping unit, rehabilitation of the complete scheme, from the intake to the SCADA system.