Reclamation of a former mill for electrical self-consumption

  • France (24)
  • 2021
  • 140 kW
  • Due diligence
  • The head of the site has been changed which makes the administrative procedures harder. Comparison of 3 different scenarios: increased head and original design flow, increased head and reduced design flow, original head, and design flow. Energy production calculation, construction cost assessment, economic return, etc. Discussions with the DDT and OFB about the environmental legislation and authorization to turbine.