Skip to main content

Project of hydroelectric power plant in Uganda

  • Ouganda
  • 2013
  • 7 000 kW
  • Summary preliminary study
  • Detailed Feasibility Study (DFS) of a new hydroelectric power plant in rural area of Uganda: detailed site visit, supervision of local experts and measurement campaigns, sizing and budget cost of structures and equipment, financial analysis.