Skip to main content

Pre-feasibility study of the major project of Sounda on the Kouilou River

  • Congo
  • 2010
  • 800 000 kW
  • Due diligence
  • Due diligence for the whole project for various scenarios (400 to 800 MW) of this major project, incl. 115 m high dam and 4 x 200 MW Francis turbines.