Pre-feasibility for the rehabilitation of an old mill
-
France (01)
-
2020
-
15 kW
-
Summary preliminary study
-
The project consists in creating a bypass to fourteen existing weirs to generate electrical power. Detailed design includes: fish friendly intake, desilting basin, load chamber, penstock, power house and double regulated Kaplan turbine. The scope of work includes the geotechnical investigations.