Pre-feasibility for the rehabilitation of an old mill

  • France (01)
  • 2020
  • 15 kW
  • Summary preliminary study
  • The project consists in creating a bypass to fourteen existing weirs to generate electrical power. Detailed design includes: fish friendly intake, desilting basin, load chamber, penstock, power house and double regulated Kaplan turbine. The scope of work includes the geotechnical investigations.