Skip to main content

Optimization study of the hydroelectric plant of Rophemel dam

  • France (22)
  • 2011 - 2012
  • 5 000 kW
  • Summary preliminary study
  • Analysis of various optimization scenario within the context of the end of the current "concession" and the transfer back to the Authority: research of optimal scenario and feasibility study. Technical part of the tender document and assistance to the plant owner for defining the operation specification and selecting an operator.