Skip to main content

Old hydroelectric plant refurbishment and power increase

  • Suisse
  • 2012 - 2013
  • 3 500 kW
  • Feasibility study
  • Turbine sizing and technical specification for two new groups. Modernization and power increase as the nominal flow rate is doubled.