Skip to main content

Installation of turbines on several drinking water distribution systems

  • France (35)
  • 2017
  • 200 kW
  • Complete project management
  • Detailed feasibility study of the installation of various types of turbines on 7 drinking water distribution systems, heads between 5 and 25 m.