Skip to main content

Improvement of the transient response of 3 Francis turbines

  • France (74)
  • 2015 - 2016
  • 1 600 kW
  • Summary preliminary study
  • Transient analysis of the penstock under various conditions and detailed investigation on the pressure relief valve to reduce the risk of water hammer.